BIM-12
360° site capture & BIM
The site as it is and the model as it was designed, in the same place the work is run from.
What is kept with the project
per project
360°
site walk photos
BIM
model viewer
IFC
exchange format
3
drawing states
Drawings are kept apart by their role — design, construction and as-built — so nothing is built from an old copy.
Seven steps, and the site is on record
capture procedure
- Upload the drawings.
- Mark the capture points on the plan.
- Mount the 360° camera on a long pole or a helmet.
- Control it from the phone app, which takes the shots and shows previews.
- Walk the site — no internet needed.
- Upload: each image links itself to its point on the plan.
- Walk the record: any point, on any date.