BIM-12

360° site capture & BIM

The site as it is and the model as it was designed, in the same place the work is run from.

Sheet BIM-12
Section
Documents
What the drawing measures
What is kept with the project
Data
Actual list
BIM-12

360° site capture & BIM

The site as it is and the model as it was designed, in the same place the work is run from.

What is kept with the project per project
360° site walk photos
BIM model viewer
IFC exchange format
3 drawing states

Drawings are kept apart by their role — design, construction and as-built — so nothing is built from an old copy.

Seven steps, and the site is on record capture procedure
  1. Upload the drawings.
  2. Mark the capture points on the plan.
  3. Mount the 360° camera on a long pole or a helmet.
  4. Control it from the phone app, which takes the shots and shows previews.
  5. Walk the site — no internet needed.
  6. Upload: each image links itself to its point on the plan.
  7. Walk the record: any point, on any date.
SheetBIM-12
SectionDocuments
What the drawing measuresWhat is kept with the project
DataActual list
Track Workflow

Start 60-day free trial

Full platform, no credit card, no commitment. Bring one live project and judge Track Workflow on your own data.

Start 60-day free trial Book a demo
60
days, free

Full platform, no credit card, no commitment. Bring one live project and judge Track Workflow on your own data.